Tear Drop

Body  Construction

8 ' Cubby Tear Drop Trailer

While working on the Tear Drop got this on camera

12 Volt switch panel need to make labels still looking for the anchor

Testing the battery. It works

Inside skins with braceing

Putting on fenders, to get the T nuts mounted

Another view of the fender

Need another hand

Getting ready to install the spars braceing the sides

The first spar install

All of the spars install

Another view of the spars

Flush mount Reading Lights

Rear Inside Lights

Outside skin being glued on

Another view of the Outside Skin

3/4 x 1" blocks used to glue to brace the inside skin

Outside skins being clamp during glueing

Door skins with epoxy coating

Outside skins with epoxy coating

Another view of the outsides

110 v install next to the 12v switch panel

110v install inside on the back buck head panel

Framing out the air vent opening.

Test fitting the roof

Using tie downs to hole the roof on while gule is setting

Back view of clams and tie downs

Edge trim on right side

Drilling the holes on the edge trim

Drilling holes in the Door Trim

1x2 by 1x4 angle used to trim door

Screwing the door trim using clamps

Another view of the clamping the door trim in place

Completed door trim

Screwing on the Side Trim

Roof and Side tirm completed

Back           Next             Home